science and engineering library
NUcat: the library catalog
ER: Electronic Resources
Find
Services
Research Assistance
About
Help
Tech Library: A Model for Tomorrow
Executive Summary
Introduction
Users and Needs
Faculty
Staff
Students
Tech group-based classes
Benchmarking
Examination of Current Facilities
Kellogg
Ford Design Center
Benchmarking--Other Libraries
Harvard University – digitized library material
Columbia University – lighting
Massachusetts Institute of Technology – 24 hour area
University of Chicago – The Regenstein Reconfiguration Project
Emory University’s Robert W. Woodruff Main Library
Main Library Renovations
Detailed Renovations
Shortcomings of the Main Library Renovations
Initial survey and interview results
Data collection methods
Data analysis methods
Major Tech Library Strengths and Weaknesses
Current Tech Library Design Strengths
Large Windows
Efficient Use of Space in Some Areas
Current Tech Library Design Weaknesses
Library Hours
Limited Computer Access
Circulation Desk
“Rotated Squares” architectural design
Staff Office Space
Aesthetics and Furniture
Group Tables
Inadequate Number of Group Work Areas
Technical Support
Lounge Area
Presentation of the Basic Design
Overall
Furniture
Lighting
Intercom System
Ground Floor
Group Study Rooms
Staff Lounge
Main Floor
After Hours Access
Circulation Desk
Public Access Computers
Technical Support
Separating Group from Individual Study Areas
Relocating Books
Group Work Rooms
Copy Room
Lounge Area
Video Conferencing
Top Floor
Group Work Rooms
Wireless Internet Access
Technology
Aesthetics
Windows
Layout
Ground Floor
(See
Appendix M1
)
Main Floor
(See
Appendix M2
)
Top Floor
(See
Appendix M3
)
Other Design Considerations
Evanston Building Codes
Wiring Plan
Ground Floor
Group Work Room
Main Floor
Circulation Desk/Circulation Room
Info Commons
Group Study Area
Office Space/Staff Conference Room/ Virtual Classroom
Group Study Rooms
Lounge
Top Floor
Group Study Rooms/Copy Room
Study area
General Considerations
Benefits of the Basic Design
Special Design
Digitizing Library Materials
Radio Frequency Identification (RFID)
Video Conferencing/ Communication
Instant Messaging/ Online Presentations
Breakout/Smart Rooms
Dedicated Academic Computer Clusters
Supporting facts
Tech Lobby Campaign
Supporting data
Users Suggestions
Cost Analysis
Essential Changes
Why our project should be implemented
References
Appendix A: IEMS Faculty Emails
Appendix B: Academic Journal Subscription
Appendix C: Meeting with Tech Library Staff on 2/17/06
Appendix D: Initial Questionnaire Results
Appendix E1: Tech Group-Based Classes (Mechanical Engineering)
Appendix E2: Tech Group-Based Classes (ECE/CS)
Attachment E2. A: ECE and CE Group Work Based Classes
Attachment E2.B: Contact with ECE and CE Professors and Assistant Professors
Attachment E2.C: Contact with ECE and CE Students
Appendix F: Meeting with Thomas Rochow - Associate Director for Operations, IDEA
Appendix G: Interview with Morteza Rahimi - Vice President and Chief Technology Officer
Appendix H: Initial Questionnaire
IE – 392 Project Survey
Appendix I: Tech Lobby Campaign Questionnaire
Tech Library Renovation Questionnaire
Appendix J:Interview with Eric Youngquist
Appendix K: Calculation of the Estimate of the Increase in the Total Number of Hours Spent in the Library
Appendix L: Furniture Pictures
Appendix M1: Proposed Ground Floor Layout
Appendix M2: Proposed Main Floor Layout
Appendix M3: Proposed Top Floor Layout
Appendix N: Meeting with James Aagaard – Professor Emeritus, Electrical Engineering
Appendix O: Meeting with Michael D. Besançon - Associate Dean Administration, Finance and Planning
Appendix P: Cost Breakdown
Appendix Q1: Current Ground Floor Layout
Appendix Q2: Current Main Floor Layout
Appendix Q3: Current Top Floor Layout
Appendix R: Tech Lobby Campaign Results
Appendix S: Preliminary Tour/Meeting with Robert Michaelson - Library Dept. Head
Appendix T: Meeting with Lori Arp and John Blosser - Library Dept. Heads
Appendix U: Meeting with Bonnie Humphrey
Appendix V: Meeting with Ron Nayler - Associated VP of Facilities Management
Appendix W: Meeting with Marvin Lofquist
Appendix X: Meeting with Bob Davis - Associate Director of Academic Technologies
Appendix Y: Contacts and Additional Notes
Appendix Z: Total Number of Public Computers in New Design
Appendix AA: Statistical Analysis of Survey Results
List of Figures
Figure 1
: Group Projects in Tech
Figure 2
: Kellogg Student Group Area
Figure 3
: Ford Center Group Work Room
Figure 4
: Columbia University Library
Figure 5
: Emory InfoCommons
Figure 6
: Tech Library
Figure 7
: Agati Four-Person Table
Figure 8
: Energos Light Fixture
Figure 9
: Circulation Desk
Figure 10
: Lounge Furniture
Figure 11
: Three Pack Carrels
Figure 12
. Group Work Table
Figure 13
: Study Carrel
Figure 14
: Virtual Collaborative Design
Figure 15
: Instant Messaging Applications
Figure 16
: Studnet Current Feature Ratings
Figure 17
: Student Potential Feature Ratings
Figure 18
: Box Plot of Increased Hours
Back to Top